ARCHITECT ATLAS
Loading atlas
YPF Tower

YPF Tower

César Pelli

Location
Puerto Madero, Buenos Aires, Argentina
Client / Owner
YPF
Year
Completed 2008
Access
Private
Typology
Commercial
Style
—

The YPF Tower in Puerto Madero, Buenos Aires, was designed by César Pelli for the oil company YPF, its developer and headquarters occupant. The article gives 2005 for the start in its text and 2006 in the infobox, and completion in September 2008, with inauguration in August 2008 by the infobox. It names no style or materials.

The tower is 160 meters (about 525 feet) tall with 44 floors and 75,000 square meters (807,000 square feet) of floor area. At completion it was the tallest office building in Argentina. The estimated cost was US$134 million, and CRIBA was the main contractor.

On May 25, 2012, it was lit in the colors of the Argentine flag three weeks after YPF's nationalization. In 2021 YPF sought US$400 million in financing and put the building, called "Torre Pelli," up for sale.

Comments

  • Loading comments…
Be kind. Anyone can flag a comment for review.

Sign in

or

Your profile

3 to 24 letters, numbers, underscores or periods. It’s shown with your comments.

Contact us

Questions, corrections or ideas? Your message goes straight to the Architect Atlas owner.

Save to list

    Edit information

    We look the building up on Wikipedia for you. Architect Atlas lists buildings that have their own Wikipedia article: our test for notoriety and our source of truth.

        Typology
        Style (one to three)
        Photo (shown in a 4:3 frame)

        Drag and zoom to frame the building well. New photos are checked before they appear.

        Every change is checked before it goes live: facts against Wikipedia, photos by eye.