Q2 Stadium at 10414 McKalla Place in Austin is a soccer-specific stadium led by the architect Gensler. Austin Commercial was the construction manager. Anthony Precourt is listed as owner and Two Oak Ventures as operator, though the text also says the city holds ownership. Groundbreaking was on September 9, 2019, and it opened on June 16, 2021. The article names no architectural style or materials.
It cost about $260 million, privately financed. The grass field measures 115 by 75 yards (105 by 69 m), and capacity is 20,738, with seated and safe-standing areas. The site covers about 24 acres.
CapMetro's McKalla station on the Red Line opened beside it in 2024. Plans for the surroundings include green space, housing and mixed-use retail. The article gives no visiting hours.

Comments