The Pelješac Bridge spans the Bay of Mali Ston in Dubrovnik-Neretva County, Croatia, and links Komarna with the Pelješac peninsula. Slovenian engineer Marjan Pipenbaher designed it. Hrvatske ceste maintains it, and the article does not state a client. Construction began on July 30, 2018, and the bridge opened on July 26, 2022.
This cable-stayed bridge has 13 spans and a total length of 7,887 feet (2,404 meters). Five central spans measure 935 feet (285 meters) each. Two pylons rise 322 feet (98 meters), and the deck is 77 feet (23.6 meters) wide with 180 feet (55 meters) of clearance below.
The bridge is toll-free and has a design life of 100 years. The article does not state its materials.