ARCHITECT ATLAS
Loading atlas
Lumen Field

Lumen Field

Ellerbe Becket with LMN Architects

Photo: SounderBruce · CC BY-SA 4.0 · Wikimedia Commons

Location
SoDo, Seattle, Washington, USA
Client / Owner
Washington State Public Stadium Authority
Year
Completed 2002
Access
Tickets required
Style
—

Lumen Field in Seattle's SoDo district was designed by Ellerbe Becket with LMN Architects. The Washington State Public Stadium Authority owns it, and First & Goal Inc., formed by Paul Allen, managed construction and operates it. The complex broke ground on September 28, 1998. The stadium opened on July 28, 2002, and the complex cost $430 million. The article names no architectural style.

The exterior is salmon-colored concrete, partly clad in red brick on the west side, with a glass curtain wall on the east. A steel truss and cable roof covers about 70 percent of the seats, spans 720 feet and has arches rising 200 feet. A friction pendulum damper system guards against earthquakes. The open north end looks over the city.

NFL capacity is 68,740. The Event Center includes the WaMu Theater. The article gives no hours or ticket details.

Comments

  • Loading comments…
Be kind. Anyone can flag a comment for review.

Sign in

or

Your profile

3 to 24 letters, numbers, underscores or periods. It’s shown with your comments.

Contact us

Questions, corrections or ideas? Your message goes straight to the Architect Atlas owner.

Save to list

    Edit information

    We look the building up on Wikipedia for you. Architect Atlas lists buildings that have their own Wikipedia article: our test for notoriety and our source of truth.

        Typology
        Style (one to three)
        Photo (shown in a 4:3 frame)

        Drag and zoom to frame the building well. New photos are checked before they appear.

        Every change is checked before it goes live: facts against Wikipedia, photos by eye.