ARCHITECT ATLAS
Loading atlas
Library of Birmingham

Library of Birmingham

Francine Houben

Mecanoo

Photo: Alex Liivet from Chester, United Kingdom · CC0 · Wikimedia Commons

Location
Centenary Square, Birmingham, England
Client / Owner
Birmingham City Council
Year
Completed 2013
Access
Public

The Library of Birmingham was designed by Mecanoo, with Francine Houben as lead architect and Buro Happold as structural and civil engineer, for Birmingham City Council. The infobox gives a start on January 7, 2010 and completion in April 2013. The text says work began in January 2010, with completion scheduled for September 3, 2013, the opening date.

The article lists the style as Postmodern and High-Tech. It names no materials. The building is 200 feet (60 m) tall, with ten floors above ground and one below, and 20,798 square meters of floor area plus 6,804 shared with the Rep theatre. The estimated cost was 188.8 million pounds.

It won the Architects' Journal Building of the Year in 2013 and was a Stirling Prize nominee in 2014. It replaced Birmingham Central Library, which was demolished in 2016. The article cites 2015 and 2016 hours, closed Sundays, and gives no current hours.

Comments

  • Loading comments…
Be kind. Anyone can flag a comment for review.

Sign in

or

Your profile

3 to 24 letters, numbers, underscores or periods. It’s shown with your comments.

Contact us

Questions, corrections or ideas? Your message goes straight to the Architect Atlas owner.

Save to list

    Edit information

    We look the building up on Wikipedia for you. Architect Atlas lists buildings that have their own Wikipedia article: our test for notoriety and our source of truth.

        Typology
        Style (one to three)
        Photo (shown in a 4:3 frame)

        Drag and zoom to frame the building well. New photos are checked before they appear.

        Every change is checked before it goes live: facts against Wikipedia, photos by eye.