The National Engineering Bureau is credited as architect, with interiors by Design Work Portfolio and TAV Construction as main contractor. Sheffield Holdings Limited is named as developer, though the text says the original developer ran out of capital. The infobox gives construction from November 8, 2006 and completion on December 7, 2017, while the text says work began in 2007 and was complete as of September 2024. The article lists the style as Postmodernist.
The architectural height is 1,394 feet (425 m), with the top floor at 1,217 feet (371 m). It has 101 floors above ground and six basements, 1.3 million square feet (120,706 m²) of floor area and 29 lifts.
The first 33 floors were designed for a Hard Rock hotel with 281 rooms and five restaurants. Floors 34 to 100 hold 498 apartments and six duplex penthouses. The 101st floor has a club lounge and restaurant. The article gives no structural or facade details.