ARCHITECT ATLAS
Loading atlas
Church of Colònia Güell

Church of Colònia Güell

Antoni Gaudí

Photo: Canaan · CC BY-SA 4.0 · Wikimedia Commons

Location
Santa Coloma de Cervelló, Spain
Client / Owner
Eusebi Güell
Year
Completed 1915
Access
Tickets required
Typology
Spiritual

Count Eusebi de Güell commissioned Antoni Gaudí in 1898 to design a church for the company town of Colònia Güell. The infobox says work started in 1898, while the text says it did not begin until 1908. The crypt was built from 1908 to 1915 and is the only fully completed part. Construction halted in 1914 after the count's death. Gaudí planned upper and lower naves, two towers and a central dome about 130 feet (40 m) high.

He designed it with hanging hemp ropes weighted by lead-filled sacks at 1:10 scale, then photographed, flipped and traced the model. The forms are hyperbolic paraboloids and hyperboloids. The pillars use brick and solid stone blocks, and the crypt has 22 lead stained glass windows.

Repairs in 2000 let visitors stand on the roof. It is part of Gaudí's UNESCO listing of 1984.

Comments

  • Loading comments…
Be kind. Anyone can flag a comment for review.

Sign in

or

Your profile

3 to 24 letters, numbers, underscores or periods. It’s shown with your comments.

Save to list

    Edit information

    We look the building up on Wikipedia for you. Architect Atlas lists buildings that have their own Wikipedia article: our test for notoriety and our source of truth.

        Typology
        Style (one to three)
        Photo (shown in a 4:3 frame)

        Drag and zoom to frame the building well. New photos are checked before they appear.

        Every change is checked before it goes live: facts against Wikipedia, photos by eye.