The CBR Building is the former headquarters of the cement company CBR, at 185 Chaussée de la Hulpe in Watermael-Boitsfort. Constantin Brodzki and Marcel Lambrichs designed it, and it was built from 1967 to 1970. The company wanted the building to show what concrete could do.
It is 103 feet (31.5 meters) high, with nine floors above ground and three below. The facade is made of 756 prefabricated oval concrete modules, and the building went up at about one floor a week. It had the first full air-conditioning system of its kind in Belgium. The landscape architect René Pechère designed the gardens.
The building was the only Belgian project in the 1979 Museum of Modern Art exhibition on modern architecture. It joined the Brussels heritage list in 2018. A coworking company renovated it, finishing in 2019. It is used as private offices.


Comments