ARCHITECT ATLAS
Loading atlas
Bayreuth Festspielhaus

Bayreuth Festspielhaus

Otto Brückwald

Photo: Rico Neitzel · CC BY-SA 2.5 · Wikimedia Commons

Location
Bayreuth, Germany
Client / Owner
Richard Wagner
Year
Completed 1876
Typology
Cultural
Style
—

Richard Wagner commissioned the opera house, and King Ludwig II of Bavaria provided the primary funding. Otto Brückwald co-supervised construction with Wagner. The article says the design was adapted from Gottfried Semper's unrealized Munich opera project, a claim marked as needing a citation. The foundation stone was laid on May 22, 1872. It was meant to open in 1873 but opened in 1876 with the first complete Ring cycle.

The interior is mainly wood, and the exterior is mostly undecorated brick, except for the ornamented entrance facade. The article calls it one of the largest free-standing timber structures ever erected. The auditorium is a single steeply raked wedge, with galleries only on the back wall.

The orchestra pit is recessed under the stage and covered by a hood, so the orchestra is hidden from the audience. The house has 1,925 seats and a reverberation time of 1.55 seconds. Repairs were completed on July 26, 2015.

Comments

  • Loading comments…
Be kind. Anyone can flag a comment for review.

Sign in

or

Your profile

3 to 24 letters, numbers, underscores or periods. It’s shown with your comments.

Save to list

    Edit information

    We look the building up on Wikipedia for you. Architect Atlas lists buildings that have their own Wikipedia article: our test for notoriety and our source of truth.

        Typology
        Style (one to three)
        Photo (shown in a 4:3 frame)

        Drag and zoom to frame the building well. New photos are checked before they appear.

        Every change is checked before it goes live: facts against Wikipedia, photos by eye.