Marcel Breuer and his partner Hamilton Smith designed this library for the Atlanta Public Library. It replaced the Beaux-Arts Carnegie Library of 1902, which was torn down. Construction began in October 1977, and the building was dedicated on May 25, 1980.
The library has eight stories above ground and about 130 feet (39.6 meters) in height. The upper floors cantilever over the lower ones. The walls are precast concrete panels with diagonal grooves and a rough, bush-hammered finish. The original design was largely windowless.
Demolition was proposed in 2008 and again in 2016, but the building stayed. The World Monuments Fund listed it as endangered in 2010. The library closed in July 2018 and reopened on October 5, 2021, after a project costing about $50 million that added windows. It is the main branch of the Fulton County Library System.