Hafeez Contractor and KEO International Consultants designed the tower, with KEO also listed as engineer. The Hiranandani Group and ETA Star Group developed it, and Dubai Civil Engineering was the main contractor. Construction began on October 3, 2006, the raft was finished on April 30, 2007, and the tower was completed on May 24, 2012.
The architectural height is 1,289 feet (392.8 m), the roof is at 1,296 feet (395 m) and the top floor at 1,029 feet (313.5 m). The infobox gives 89 floors including four below ground, while the introduction says 88 stories. Floor area is 1.5 million square feet (139,544 m²).
It has 289 residential units, each duplex with a private elevator, along with 62 lifts and 57 swimming pools. The article says 79 percent of units sold before construction started, and it reports damage from a strike in 2026. It gives no facade or structural details.